Could the organizers please clarify the intended cost threshold and accuracy constraints for Personal Best Gold?

The Gold challenge requires 60% savings against a five-qubit baseline of 57024, i.e. cost <= 22809.6. Each RX/RY/RZ costs 44, T costs 1, and every auxiliary wire doubles the cost. Accuracy is 1e-8 entrywise, including global phase.

Our generic exact synthesis uses 4**n - 1 scalar rotations and no auxiliary wires. Costs at n=2,3,4,5 are 660, 2772, 11220, 45012. Rechecking the 16 matrices from both public seeds gives maximum entrywise error below 1.8e-14. The five-qubit saving is 21.0648%, so the circuit is accurate but fails Gold’s resource target.

A fixed exact circuit for a generic SU(32) needs 1023 independent continuous parameters, and the allowed scalar rotations each supply at most one. Our construction reaches that rotation count. The Gold budget allows only 518 rotations before any T gates or auxiliary-wire costs.

This does not rule out an approximate method using discrete gate choices. However, direct Ross-Selinger compilation of 16 representative rotations used 76–86 T gates at 1e-8 per-gate precision, exceeding the 44-unit rotation charge; controlling full-circuit error would require tighter per-gate precision.

Is 60% the intended threshold with this gate set, baseline, auxiliary-wire multiplier, and accuracy tolerance? The challenge text suggests savings through structural exact synthesis, so we may be missing an intended distinction between exact and approximate synthesis. If permitted, is there a public reference for the intended approximation approach within the stated wire and runtime constraints?

Thank you for clarifying.