We Team Sirius,
My submission gets Silver at 21.0% on all sizes, with max error around 1e-14. The costs are exactly 44 × (4^n − 1): 15, 63, 255 and 1023 rotations for n = 2 to 5.
As far as I can tell, that’s the floor for this cost model:
- A Haar-random n-qubit unitary has 4^n − 1 real parameters once you remove the free global phase.
- In the gate set, only RX, RY and RZ carry continuous parameters, so any fixed gate template needs at least 4ⁿ − 1 rotations. At n = 5 that’s a cost of 45,012, which is a 21.06% saving.
- Gold needs a cost of at most 22,810, which leaves about 518 rotations. The other parameters would have to come from T gates.
- Clifford+T approximation costs more than a rotation here: gridsynth needs roughly 3·log₂(1/ε) ≈ 100 T per rotation at the precision this tolerance requires, versus 44.
- Ancilla tricks don’t help either, since each auxiliary wire doubles the cost.
Could the organizers clarify:
- Is Gold meant to be reachable for truly Haar-random inputs at ATOL = 1e-8?
- If so, is there a detail of the cost model or test unitaries I’m missing, such as a looser tolerance, special-angle pricing, or structured test cases?
Separately, submissiob_circ seems to run in the same namespace as the grader, so a submission could change the scoring globals. It might be worth isolating that.
Thanks!